Vision for Somersett

I thought you should know

Emails I have chosen to make public, so you can read for yourself how decisions about our community are being made.

Discussion

Swimming pool discussion

When I was elected to the board, I was obligated to respond to our residents. In 2024 we surveyed residents to determine what should be built on the 1-acre parcel in front of the TCTC. No one wanted to pay for any project if it meant raising dues. The parcels in front of the two buildings are the last two parcels Somersett owns that can be built upon.

I asked Jacob if I could write a proposal for the Happenings post. Here is a copy of the email I sent to Jacob, and his response.

— Bill O’Donnell

My comment

The $15 million figure didn’t come from me; it came from Jacob. However, there was nothing to back up that figure. The cost depended on what the plans, which never had a chance to be drawn up, would include. This misinformation killed the proposal. No one can predict construction costs until there are plans drawn up.

“If you have to lie to win, what you win is a lie.”

— Bill O’Donnell