The East Entrance welcome wall is being rebuilt with reserve funds. Here is what the signed board minutes and the Association’s own reserve study say, so you can judge for yourself.
February 25, 2026 board meeting
The vote
Two sealed bids were opened for the East Entrance renovation: CMJR Construction at $270,557 and Reliance Grounds Management at $236,475. Part of the entry sits on an easement that the original developer deeded to a private owner instead of to Somersett, so the bid was approved on the condition that the easement be resolved first.
Here is what the signed minutes record.
“Treasurer Maples asked and was advised that reserve funds could be used for the renovation project.”
Signed minutes, February 25, 2026
“Director O’Donnell asked and was advised that the plans propose to modify the existing wall by installing a water feature. He expressed his concern that the matter will end up in court and any decision may favor the private owner as opposed to Somersett.”
Signed minutes, February 25, 2026
“Director O’Donnell stated the contract is for a lot of money and that Somersett should wait for a court order then try to get a better bid. By moving forward, we are putting the cart before the horse.”
Signed minutes, February 25, 2026
| Director | Vote |
|---|---|
| Jacob Williams, President | In favor |
| Hal Lenox, Secretary | In favor |
| Clint Maples, Treasurer | In favor |
| Bill O’Donnell, Director | Abstained |
| Kate Falcocchia, Vice President | Absent |
Seven months later, I asked why the welcome wall and new fountain were being funded from reserves. Management explained that the welcome wall is an existing reserve asset and the water feature is part of the wall’s remodel, not a separate asset. I noted that the project cost is approximately $237,000 and that I did not believe it was necessary.
Summary of the signed minutes, September 30, 2026
General Common Reserve Study
What the reserve study says
Reserve funds are set aside to repair and replace the things we already own, on the schedule our reserve specialist sets. The welcome wall is in the reserve study as component #796, described as:
“This is to repair, replace and refurbish the stucco face custom identity monument sign. Includes stucco repair, paint, lighting, lettering replacement, etc.”
That description does not mention a waterfall, a fountain, or landscaping enhancements. The wall was last refurbished in 2018 for $56,214.
Nevada law is clear about what reserves are for. NRS 116.3115 requires reserves “for the repair, replacement and restoration of the major components” of the common elements, and says “the reserves may be used only for those purposes.” A new water feature and landscaping enhancements are additions, not repairs to what we already own. I believe owners deserve to know whether paying for them out of reserves meets that standard.
| Reserve study in effect at the vote (2025–26) | What the board approved | |
|---|---|---|
| Welcome wall (#796) | $71,810 in today’s dollars $104,002 budgeted for replacement in 2040 | $236,475 (whole East Entrance contract) |
| Scheduled replacement | 2040, with 15 years of life remaining | 2026 |
| Other East Entrance money | $22,500 one-time rehab (#797) | — |
- The new reserve study, prepared this fall after the vote, raised the wall to $115,000, moved its replacement to 2026, and added the note “East Entrance Renovation – Landscaping Enhancements & Entry Welcome Wall Upgrades.”
- Even with that change, the wall ($115,000) and a one-time entry item ($23,175) add up to about $138,000, roughly $98,000 less than the $236,475 contract.
My comment
Questions every owner deserves answered
Reserves are your money, saved to repair and replace what we already own. I abstained because I believed we should settle the easement first and then seek a better price. I still believe a project of this size deserved a clear answer on whether it belonged in reserves at all.
— Bill O’DonnellWhat I am asking
- How much of the $236,475 repairs or replaces the existing wall, and how much pays for new features such as the water feature and landscaping?
- Why was a component scheduled for 2040 replaced in 2026?
- Was the reserve specialist asked about this project before the vote, or only after?
- Did the Association’s attorney confirm that using reserves for new features complies with NRS 116.3115?
- Sources: SOA Board of Directors signed minutes for February 25, 2026 and September 30, 2026; SOA General Common Reserve Study 2025–26 and 2027 General Common Reserve Study (Browning Reserve Group); Nevada Revised Statutes 116.3115(2)(b). The SOA documents are posted for owners at somersett.org under Documents & Forms.